Repository logo
 
Publication

Geothermal energy use, country update for Portugal

dc.contributor.authorNunes, João Carlos
dc.contributor.authorCoelho, Luis Manuel Rodrigues
dc.contributor.authorCarvalho, José Martins
dc.contributor.authorCarvalho, Maria da Graça
dc.date.accessioned2024-03-01T14:06:07Z
dc.date.available2024-03-01T14:06:07Z
dc.date.issued2022
dc.descriptionTrabalho apresentado em European Geothermal Congress 2022, Berlin, Germany, 17-21 October 2022pt_PT
dc.description.abstractThe presence of high-temperature geothermal resources, and the production of electricity from geothermal resources in Portugal, are restricted to the volcanic islands of the Azores Archipelago located in the North Atlantic Ocean. Three geothermal binary power plants are installed and running normally in the islands of S. Miguel and Terceira, the most economically developed, with a total capacity running of 26 MWe and an average production of about 200 GWh/year. The total production of those power plants in 2021 represented about 20 % of the total demand of the Azores archipelago. New nine vertical and directional wells were drilled in 2021 in both islands to increase the total running capacity of power plants, or at least saturate them, especially the Pico Alto geothermal power plant, Terceira Island. Following the call released in 2018 for geothermal projects, sponsored by the FAI – “Fundo de Apoio à Inovação”, to promote the use of geothermal resources in Portugal, namely the low enthalpy resources associated with Thermal Baths/Spas facilities, two district heating networks for hotels and public buildings are under completion: (i) Chaves (74 oC, 25 l/s) and (ii) S. Pedro do Sul (67 oC, 19.4 l/s). Furthermore, in Chaves, an independent small operation (110 kWth) was open in January 2022 in an emblematic museum located over an impressive former Roman Thermal Bath with innovations regarding the environmental management of the geothermal fluid and its disposal.Concerning GSHPs, the potential is huge and continues to be exploited, with new projects ongoing and new specific regulations are expected to be approved shortly. There are a few installations registered until now, but the technical data of the operations are scarce and do not represent the totality of what is installed in Portugal.pt_PT
dc.description.versionN/Apt_PT
dc.identifier.urihttp://hdl.handle.net/10400.26/50105
dc.language.isoengpt_PT
dc.subjectPortugal 2021pt_PT
dc.subjectPower generationpt_PT
dc.subjectThermal bathspt_PT
dc.subjectShallow geothermal energypt_PT
dc.titleGeothermal energy use, country update for Portugalpt_PT
dc.typeconference object
dspace.entity.typePublication
person.familyNameRodrigues Coelho
person.givenNameLuís Manuel
person.identifier.ciencia-id5E15-98CA-9D3C
person.identifier.orcid0000-0002-6267-2414
rcaap.rightsopenAccesspt_PT
rcaap.typeconferenceObjectpt_PT
relation.isAuthorOfPublicationecdcf2b4-96d9-4afe-9949-0971df48e25e
relation.isAuthorOfPublication.latestForDiscoveryecdcf2b4-96d9-4afe-9949-0971df48e25e

Files

Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
PORTUGAL EGC 2022 country update.pdf
Size:
1.17 MB
Format:
Adobe Portable Document Format
License bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.85 KB
Format:
Item-specific license agreed upon to submission
Description: