Name: | Description: | Size: | Format: | |
---|---|---|---|---|
802.43 KB | Adobe PDF |
Authors
Advisor(s)
Abstract(s)
This paper aims the application of the Portuguese infrastructure asset management (IAM) methodology to a case study. This methodology establishes that the IAM plan should have three distinct planning levels: strategic, tactical and operational. Each one of these levels follows a five-step structured sequence: (i) definition of objectives, assessment criteria, metrics and targets; (ii) diagnosis; (iii) plan elaboration, along with the identification, comparison and selection of alternative solutions; (iv) plan implementation; (v) plan monitoring and review. The paper will focus, mainly in steps (i) to (iii) and to the tactical level of planning. Results obtained are discussed and the main conclusions are presented.
Description
Trabalho apresentado no 15th Computing and Control in the Water Industry (CCWI2017), 5-7 de setembro 2017, Sheffield, Reino Unido
Keywords
Infrastructure Asset Management Performance Planning Urban Water Infrastructures