IPS - ESTB - SEG - Capítulos em livros
Permanent URI for this collection
Browse
Browsing IPS - ESTB - SEG - Capítulos em livros by Author "Almeida, Maria do Céu"
Now showing 1 - 2 of 2
Results Per Page
Sort Options
- Management of urban drainage infrastructurePublication . Carriço, Nelson; Almeida, Maria do Céu; Leitão, João P.This chapter briefly presents concepts and methodologies to support the management of urban drainage infrastructure. After the introduction, data requirements for assessing the condition of urban drainage systems are presented. Data can be collected in different ways. Data analysis allows for determining structural and functional issues and system performance. The causes and consequences of failures are required for condition assessment and are the subject of the risk section. Any intervention in the urban drainage system has a cost that must be assessed. Mathematical modelling of the urban drainage systems has an advantage for evaluating the hydraulic and structural performance. Decisions on the management of urban drainage rehabilitation need to be addressed considering the different points of view or aspects that are often contradictory. This may be addressed by using multi-criteria decision analysis methodologies.
- Risk analysis of water harvesting systemsPublication . Almeida, Maria do Céu; Carriço, Nelson; Santos, João; Eslamian, SaeidRainwater harvesting systems (RWHS) can result in important benefits, but there are a number of potential negative risks. The risks associated with RWHS depend on several factors and duly consideration is required to ensure that risks associated with this type of solutions are low. Therefore, a generic and systematic approach to manage risk is required. This chapter introduces a brief overview of concepts and terminology adopted. Subsequently, an overview of common approaches to risk management is presented. The chapter focuses on specific aspects for the application of these approaches to RWHS, with emphasis on risk identification, specific risk treatment action, and monitoring. Different approaches on how to determine risks such as water safety plan (WSP), risk management process (RMP), and hazard analysis and critical control point (HACCP) can be used, but all of them have some common steps.
